Saturday, April 30, 2011

Workday Results

Today we had 14 volunteers at our workday. Six of them were young adults and the other eight of us were young at heart. We had four new volunteers and an international friend, Joel, from Tanzania. It was his first time to see our headquarters.

Wheels Hung, bikes organized
foosball game in place

Trike holders put in the wall, wheel blocks made so the three trikes can hang up

Free floor space

Table area cleaned and can now be used

Sale bike room sorted. If you are in need of a bike, we sell some used bikes

Office cleaned

Wouldn't it be nice if the office stayed like this?

16 children's bikes prepared this week. Ready to be delivered to tomorrow through a partnership with Wheaton Evangelical Free Church and Lincoln School

Tire racks designed and built by Kevin, our in house engineer. We got two racks. Each rack will hold about 200 tires. Oh we are sooooooo glad to finally have all our tires sorted

Room to walk between the 2 tire racks to access all sizes of tires

Imagine, our tubes are all sorted too and located in the same area as the tires.

Thanks to all those who helped us paint, sort, clean, sweep, work on bikes, do carpentry work, organize the office and all the other things we did from 9AM-2PM today. Our workday was a huge success.


No comments:

Post a Comment