4/20/10
At 10:00 PM, Kevin, our trike engineer had his truck loaded with all the stuff he had stored in his basement. We headed over to the headquarters to drop the first load off.
Pictures of the lower level
Entering HWI Headquarters at 10:30PM
My office
Front door-reception areaFloor layout
Floor layout
No comments:
Post a Comment